Named in 2 PJM planning documents for 2 projects, from August 13, 2026 to October 16, 2026.

Not stateddescribed as
PENELECzone
115 kVkV as printed
2mentions

PJM interconnection queue

A PJM queue substation page has the same name: Eagle Valley (PA) — 2 queue requests filed, 2 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Eagle Valley-Westfall 115 kV EVW Line Rebuild
PN-2019-036
Conceptual $51.69 M 06/14/2030 Not printed 2026-10-16
SRRTEP Mid-Atlantic
Eagle Valley – Philipsburg 115 kV Line, PA
PN-2024-004
Conceptual $38.41 M 12/29/2028 Not printed 2026-08-13
SRRTEP Mid-Atlantic

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Mid-Atlantic
Item 08 - Penelec Supplemental Projects Presentation p. 3
Eagle Valley-Westfall 115 kV EVW Line Rebuild No role wording
115 kV
2026-08-13 SRRTEP Mid-Atlantic
Item 04 - Penelec Supplemental Projects p. 3
Eagle Valley – Philipsburg 115 kV Line, PA No role wording
115 kV