PJM queue ID C01-1354

Dumont 345 kV (C01-1354) is listed in the PJM interconnection queue as a 200 MW battery project in St. Joseph County, IN. The filing names Dumont as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.

Queue IDC01-1354
Project nameDumont 345 kV
Status (as published)Active
SubstationDumont
Point of interconnectionDumont 345 kV
CountySt. Joseph
StateIN
Voltage345 kV
Capacity200 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-12-31
Source datasetcycle

Same substation and county

Dumont substation: 7 requests in the PJM queue, 3 active totaling 320 MW.

Queue IDProjectMWResourceStatus
AG2-230Dumont 345 kV90SolarActive
AH1-153Dumont 345 kV30SolarActive
V2-019ADumont 765kV7,900Not reportedWithdrawn
AG1-238Dumont 345 kV90SolarWithdrawn
AH1-152Dumont 345 kV30BatteryWithdrawn
AH1-154Dumont 345 kV30BatteryWithdrawn

St. Joseph, IN: 33 requests in the PJM queue, 11 active totaling 1,388.3 MW.

A substation with the same name is named in PJM transmission planning materials: Dumont (AEP, 8 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperJuno Power Management LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy200.0
MW capacity200.0
MFO200.0
Submitted date4/27/2026
Last updated7/9/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first