Eugene substation interconnection queue

3 active projects totalling 273.8 MW in the PJM queue, plus 4 with terminal status (shown greyed).

3active projects
273.8active MW
7total filed
Queue IDProjectkVMWResourceStatus
AH1-453 Eugene 345 kV 345 150 Battery Withdrawn
AH2-153 Eugene 345 kV 345 140 Hybrid Withdrawn
C01-2088 Eugene 345 kV 345 120 Hybrid Active
AH2-154 Eugene 345 kV 345 118 Hybrid Withdrawn
AG2-126 Eugene 345 kV 345 90 Hybrid Active
AF1-204 Vermilion Grove Wind 345 63.8 Wind EP
AH1-289 Eugene 345 kV 345 52.8 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.