Sullivan - Dequine substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Sullivan - Dequine as the point of interconnection, all in IN.
Target commercial operation dates as filed run from Jan 2024 to Dec 2025 (4 filings).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-556 | Sullivan - Dequine 345 kV | 345 | 253.4 | Other | Withdrawn | Jan 2024 |
| AG2-407 | Sullivan - Dequine 345 kV | 345 | 120 | Solar | Withdrawn | Dec 2025 |
| AH1-303 | Sullivan - Dequine 345 kV | 345 | 75 | Battery | Withdrawn | Dec 2025 |
| AI2-161 | Sullivan - Dequine 345 kV | 345 | 48 | Solar | Withdrawn | Dec 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Vigo County, IN
- Dequine - Sullivan: 2 active, 882.9 MW of 3 filed
Other PJM queue substations in Vermillion County, IN
- Eugene: 3 active, 273.8 MW of 7 filed
- Eugene - Dequine: 2 active, 117 MW of 5 filed
- Dequine - Eugene: none active of 6 filed