Substation Scout

Sullivan - Dequine substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).

4 PJM queue filings name Sullivan - Dequine as the point of interconnection, all in IN.

Target commercial operation dates as filed run from Jan 2024 to Dec 2025 (4 filings).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-556 Sullivan - Dequine 345 kV 345 253.4 Other Withdrawn Jan 2024
AG2-407 Sullivan - Dequine 345 kV 345 120 Solar Withdrawn Dec 2025
AH1-303 Sullivan - Dequine 345 kV 345 75 Battery Withdrawn Dec 2025
AI2-161 Sullivan - Dequine 345 kV 345 48 Solar Withdrawn Dec 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Vigo County, IN

All 3 PJM queue filings in Vigo County, IN.

Other PJM queue substations in Vermillion County, IN

All 15 PJM queue filings in Vermillion County, IN.