Substation Scout

Vermillion, IN interconnection queue

3 active projects totalling 273.8 MW in the PJM queue, plus 12 with terminal status (shown greyed).

3active projects
273.8active MW
15total filed
Queue IDProjectkVMWResourceStatus
AH1-740 Sullivan-Dequine 345 kV 345 707 Gas Withdrawn
AH1-745 Eugene-Sullivan 345 kV 345 707 Gas Withdrawn
C01-1583 Eugene - Dequine 345 kV 345 300 Battery Withdrawn
C01-1582 Eugene - Dequine 345 kV 345 288.6 Solar Withdrawn
AH2-257 Dequine - Eugene 345 kV 345 240 Solar Withdrawn
AH1-453 Eugene 345 kV 345 150 Battery Withdrawn
AH2-153 Eugene 345 kV 345 140 Hybrid Withdrawn
AG2-407 Sullivan - Dequine 345 kV 345 120 Solar Withdrawn
C01-2088 Eugene 345 kV 345 120 Hybrid Active
AH2-154 Eugene 345 kV 345 118 Hybrid Withdrawn
AG2-126 Eugene 345 kV 345 90 Hybrid Active
AH1-303 Sullivan - Dequine 345 kV 345 75 Battery Withdrawn
AF1-204 Vermilion Grove Wind 345 63.8 Wind EP
AH1-289 Eugene 345 kV 345 52.8 Wind Withdrawn
AI2-161 Sullivan - Dequine 345 kV 345 48 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.