Eugene - Dequine substation interconnection queue

2 active projects totalling 117 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
117active MW
5total filed
Queue IDProjectkVMWResourceStatus
C01-1583 Eugene - Dequine 345 kV 345 300 Battery Withdrawn
C01-1582 Eugene - Dequine 345 kV 345 288.6 Solar Withdrawn
AH2-025 Eugene - Dequine 345 kV 345 200 Hybrid Withdrawn
AG2-343 Eugene - Dequine 345 kV 345 78 Battery Active
AG2-345 Eugene - Dequine 345 kV 345 39 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.