Deer Creek-Fisher Body-Mullin substation interconnection queue
1 active project totalling 26 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
26active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-492 | Deer Creek-Fisher Body-Mullin 138kV | 138 | 106.4 | Wind | Withdrawn |
| U3-002 | Wildcat Wind Farm I | 138 | 26 | Wind | In Service |
| AF1-080 | Deer Creek-Fisher Body-Mullin 138 kV | 138 | 20 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.