Deer Creek-Fisher Body-Mullin substation interconnection queue
1 active project totaling 26 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Deer Creek-Fisher Body-Mullin as the point of interconnection, all in IN.
Target commercial operation dates as filed run from Dec 2012 to Sep 2021 (3 filings).
1active projects
26active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-492 | Deer Creek-Fisher Body-Mullin 138kV | 138 | 106.4 | Wind | Withdrawn | Dec 2012 |
| U3-002 | Wildcat Wind Farm I | 138 | 26 | Wind | In Service | Dec 2012 |
| AF1-080 | Deer Creek-Fisher Body-Mullin 138 kV | 138 | 20 | Battery | Withdrawn | Sep 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Grant County, IN
- Deer Creek: 2 active, 211.3 MW of 2 filed
- Mississinewa-Gaston: 3 active, 136 MW of 3 filed
- Mississinewa: 3 active, 74.4 MW of 3 filed
- Greentown - Hummel Creek: none active of 2 filed
Other PJM queue substations in Madison County, IN
- Fall Creek: 2 active, 380 MW of 4 filed
- Greentown: none active of 7 filed
- Makahoy: none active of 4 filed
Site Scanner