Mississinewa-Gaston substation interconnection queue
3 active projects totaling 136 MW in the PJM queue.
3 PJM queue filings name Mississinewa-Gaston as the point of interconnection, all in Grant County, IN.
Target commercial operation dates as filed run from May 2026 to Dec 2030 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
3active projects
136active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-207 | Golden Aster Solar Energy Center | 138 | 67.2 | Solar | Suspended | May 2026 |
| AE2-172 | Golden Aster Solar Energy Center | 138 | 40 | Battery | Suspended | May 2026 |
| AH1-306 | Mississinewa-Gaston 138 kV | 138 | 28.8 | Solar | Active | Dec 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Grant County, IN
- Deer Creek: 2 active, 211.3 MW of 2 filed
- Mississinewa: 3 active, 74.4 MW of 3 filed
- Deer Creek-Fisher Body-Mullin: 1 active, 26 MW of 3 filed
- Greentown - Hummel Creek: none active of 2 filed
Site Scanner