Mississinewa-Gaston substation interconnection queue

3 active projects totalling 136 MW in the PJM queue.

3active projects
136active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-207 Golden Aster Solar Energy Center 138 67.2 Solar Suspended
AE2-172 Golden Aster Solar Energy Center 138 40 Battery Suspended
AH1-306 Mississinewa-Gaston 138 kV 138 28.8 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.