Deer Creek substation interconnection queue
2 active projects totaling 211.3 MW in the PJM queue.
2 PJM queue filings name Deer Creek as the point of interconnection, all in Grant County, IN.
Target commercial operation dates as filed run from Mar 2016 to Sep 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1788 | Deer Creek 138 kV | 138 | 210 | Battery | Active | Sep 2030 |
| Z2-115 | Deer Creek Solar Facility | 12.5 | 1.3 | Solar | In Service | Mar 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Deer Creek (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Grant County, IN
- Mississinewa-Gaston: 3 active, 136 MW of 3 filed
- Mississinewa: 3 active, 74.4 MW of 3 filed
- Deer Creek-Fisher Body-Mullin: 1 active, 26 MW of 3 filed
- Greentown - Hummel Creek: none active of 2 filed