Makahoy substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Makahoy as the point of interconnection, all in Madison County, IN.
Target commercial operation dates as filed run from Dec 2022 to Jul 2028 (4 filings).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD1-043 | Lone Oak Solar | 138 | 45.6 | Solar | Withdrawn | Jul 2028 |
| AE2-171 | Makahoy 138 kV | 138 | 30 | Battery | Withdrawn | Dec 2022 |
| AI2-152 | Makahoy 138 kV | 138 | 28.8 | Solar | Withdrawn | Dec 2025 |
| AH1-293 | Makahoy 138 kV | 138 | 26.4 | Solar | Withdrawn | Dec 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Madison County, IN
- Fall Creek: 2 active, 380 MW of 4 filed
- Deer Creek-Fisher Body-Mullin: 1 active, 26 MW of 3 filed
- Greentown: none active of 7 filed
Site Scanner