Makahoy substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).

4 PJM queue filings name Makahoy as the point of interconnection, all in Madison County, IN.

Target commercial operation dates as filed run from Dec 2022 to Jul 2028 (4 filings).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AD1-043 Lone Oak Solar 138 45.6 Solar Withdrawn Jul 2028
AE2-171 Makahoy 138 kV 138 30 Battery Withdrawn Dec 2022
AI2-152 Makahoy 138 kV 138 28.8 Solar Withdrawn Dec 2025
AH1-293 Makahoy 138 kV 138 26.4 Solar Withdrawn Dec 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Madison County, IN

All 17 PJM queue filings in Madison County, IN.