Substation Scout

Makahoy substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AD1-043 Lone Oak Solar 138 45.6 Solar Withdrawn
AE2-171 Makahoy 138 kV 138 30 Battery Withdrawn
AI2-152 Makahoy 138 kV 138 28.8 Solar Withdrawn
AH1-293 Makahoy 138 kV 138 26.4 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.