Madison, IN interconnection queue

4 active projects totalling 473 MW in the PJM queue, plus 13 with terminal status (shown greyed).

4active projects
473active MW
17total filed
Queue IDProjectkVMWResourceStatus
AF2-407 Liberty II Storage 345 300 Battery Withdrawn
C01-1356 Fall Creek 345 kV 345 300 Battery Active
U4-039 Greentown 138kV 138 92.3 Wind Withdrawn
AH1-400 Jones Creek - Aladdin 138 kV 138 90 Solar Withdrawn
AF2-408 Fall Creek Energy Storage 138 80 Battery Engineering and Procurement
AD1-139 Mullin-Grant Tap 138 kV 138 69 Solar Withdrawn
AD2-071 Madison County Solar 138 67 Solar Suspended
AH1-401 Jones Creek - Aliddin 138 kV 138 60 Battery Withdrawn
AD1-043 Lone Oak Solar 138 45.6 Solar Withdrawn
AE2-171 Makahoy 138 kV 138 30 Battery Withdrawn
AI2-152 Makahoy 138 kV 138 28.8 Solar Withdrawn
AH1-293 Makahoy 138 kV 138 26.4 Solar Withdrawn
U3-002 Wildcat Wind Farm I 138 26 Wind In Service
AH2-243 South Summitville 69 kV 69 25.8 Solar Withdrawn
AC1-088 Strawton 138kV 138 20 Battery Withdrawn
AF1-080 Deer Creek-Fisher Body-Mullin 138 kV 138 20 Battery Withdrawn
U4-038 Mullin-Greentown Tap 138kV 138 13 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.