Grant, IN interconnection queue

9 active projects totalling 497.3 MW in the PJM queue, plus 6 with terminal status (shown greyed).

9active projects
497.3active MW
15total filed
Queue IDProjectkVMWResourceStatus
C01-1788 Deer Creek 138 kV 138 210 Battery Active
AI1-134 Greentown - Hummel Creek 138 kV 138 200 Hybrid Withdrawn
AI2-492 Deer Creek-Fisher Body-Mullin 138kV 138 106.4 Wind Withdrawn
AG2-412 Greentown - Hummel Creek 138 kV 138 78.4 Hybrid Withdrawn
C01-1701 Wildcat Wind 138 kV 138 75.6 Wind Active
AF2-204 Van Buren-Delaware 138 kV 138 72 Hybrid Withdrawn
AE1-207 Golden Aster Solar Energy Center 138 67.2 Solar Suspended
AG1-414 BR Solar Sheriff 1 138 45 Solar Engineering and Procurement
AE2-172 Golden Aster Solar Energy Center 138 40 Battery Suspended
AI2-148 Mississinewa- Gaston 138 kV 138 38.4 Solar Withdrawn
AH1-306 Mississinewa-Gaston 138 kV 138 28.8 Solar Active
AG2-546 Van Buren - Delaware 138 kV 138 26.4 Hybrid Withdrawn
AG2-191 Mississinewa 138 kV 138 18 Hybrid Active
AG2-192 Mississinewa 138 kV 138 11.4 Hybrid Active
Z2-115 Deer Creek Solar Facility 12.5 1.3 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.