Wildcat Wind Farm I
PJM queue ID U3-002
Wildcat Wind Farm I (U3-002) is listed in the PJM interconnection queue as a 26 MW wind project in Madison County, IN. The filing names Deer Creek-Fisher Body-Mullin as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2012.
| Queue ID | U3-002 |
|---|---|
| Project name | Wildcat Wind Farm I |
| Status (as published) | In Service |
| Substation | Deer Creek-Fisher Body-Mullin |
| Point of interconnection | Deer Creek-Fisher Body-Mullin 138kV |
| County | Madison |
| State | IN |
| Voltage | 138 kV |
| Capacity | 26 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2012-12-31 |
| Source dataset | serial |
Same substation and county
Deer Creek-Fisher Body-Mullin substation: 3 requests in the PJM queue, 1 active totaling 26 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-492 | Deer Creek-Fisher Body-Mullin 138kV | 106.4 | Wind | Withdrawn |
| AF1-080 | Deer Creek-Fisher Body-Mullin 138 kV | 20 | Battery | Withdrawn |
Madison, IN: 17 requests in the PJM queue, 3 active totaling 406 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 200 |
| MW capacity | 26 |
| MFO | 200 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.