3 active projects totaling 74.4 MW in the PJM queue.
3 PJM queue filings name Mississinewa as the point of interconnection, all in Grant County, IN.
Target commercial operation dates as filed run from Apr 2029 to Oct 2029 (3 filings). 3 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (2 filings).
3active projects
74.4active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-414 | BR Solar Sheriff 1 | 138 | 45 | Solar | Engineering and Procurement | Apr 2029 |
| AG2-191 | Mississinewa 138 kV | 138 | 18 | Solar | Active | Oct 2029 |
| AG2-192 | Mississinewa 138 kV | 138 | 11.4 | Solar | Active | Oct 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Grant County, IN
- Deer Creek: 2 active, 211.3 MW of 2 filed
- Mississinewa-Gaston: 3 active, 136 MW of 3 filed
- Deer Creek-Fisher Body-Mullin: 1 active, 26 MW of 3 filed
- Greentown - Hummel Creek: none active of 2 filed