Greentown - Hummel Creek substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Greentown - Hummel Creek as the point of interconnection, all in Grant County, IN.

Target commercial operation dates as filed run from Oct 2024 to Apr 2029 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI1-134 Greentown - Hummel Creek 138 kV 138 200 Hybrid Withdrawn Apr 2029
AG2-412 Greentown - Hummel Creek 138 kV 138 78.4 Hybrid Withdrawn Oct 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Grant County, IN

All 15 PJM queue filings in Grant County, IN.