Greentown - Hummel Creek substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Greentown - Hummel Creek as the point of interconnection, all in Grant County, IN.
Target commercial operation dates as filed run from Oct 2024 to Apr 2029 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI1-134 | Greentown - Hummel Creek 138 kV | 138 | 200 | Hybrid | Withdrawn | Apr 2029 |
| AG2-412 | Greentown - Hummel Creek 138 kV | 138 | 78.4 | Hybrid | Withdrawn | Oct 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Grant County, IN
- Deer Creek: 2 active, 211.3 MW of 2 filed
- Mississinewa-Gaston: 3 active, 136 MW of 3 filed
- Mississinewa: 3 active, 74.4 MW of 3 filed
- Deer Creek-Fisher Body-Mullin: 1 active, 26 MW of 3 filed