Fall Creek substation interconnection queue
2 active projects totalling 380 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
380active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-407 | Liberty II Storage | 345 | 300 | Battery | Withdrawn |
| C01-1356 | Fall Creek 345 kV | 345 | 300 | Battery | Active |
| AH2-352 | Fall Creek 345 kV | 345 | 240 | Solar | Withdrawn |
| AF2-408 | Fall Creek Energy Storage | 138 | 80 | Battery | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.