Fall Creek substation interconnection queue

2 active projects totaling 380 MW in the PJM queue, plus 2 with terminal status (shown grayed).

4 PJM queue filings name Fall Creek as the point of interconnection, all in Madison County, IN.

Target commercial operation dates as filed run from Jun 2022 to Dec 2030 (4 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: AEP (2 filings).

2active projects
380active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF2-407 Liberty II Storage 345 300 Battery Withdrawn Jun 2022
C01-1356 Fall Creek 345 kV 345 300 Battery Active Dec 2030
AH2-352 Fall Creek 345 kV 345 240 Solar Withdrawn Dec 2026
AF2-408 Fall Creek Energy Storage 138 80 Battery Engineering and Procurement Jan 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Fall Creek (AEP, 5 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Madison County, IN

All 17 PJM queue filings in Madison County, IN.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first