Putnam, IL interconnection queue
3 active projects totalling 1,280.2 MW in the PJM queue, plus 3 with terminal status (shown greyed).
3active projects
1,280.2active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2036 | Crescent Ridge - Corbin 138 kV | 138 | 1,150 | Gas | Active |
| C01-1722 | Kewanee 138kV - Oglesby 138kV 138 kV | 138 | 120 | Solar | Active |
| AH1-769 | Not reported | n/r | 101.2 | Hybrid | Withdrawn |
| AF1-318 | Crescent Ridge-Corbin | n/r | 52.8 | Wind | Withdrawn |
| T143 | Hennepin | n/r | 50 | Wind | Withdrawn |
| AC1-168 | Hickory Wind | n/r | 10.2 | Wind | Suspended |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.