Pondtown Solar 2
PJM queue ID AB2-032
Pondtown Solar 2 (AB2-032) is listed in the PJM interconnection queue as a 13.6 MW solar project in Queen Anne's County, MD. The filing names Church-Wye Mills as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2023.
| Queue ID | AB2-032 |
|---|---|
| Project name | Pondtown Solar 2 |
| Status (as published) | In Service |
| Substation | Church-Wye Mills |
| Point of interconnection | Church-Wye Mills 138 kV |
| County | Queen Anne's |
| State | MD |
| Voltage | 138 kV |
| Capacity | 13.6 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2023-12-31 |
| Source dataset | serial |
Same substation and county
Church-Wye Mills substation: 2 requests in the PJM queue, 2 active totaling 21.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB2-153 | Pondtown Solar 2 | 7.6 | Solar | In Service |
Queen Anne's, MD: 45 requests in the PJM queue, 8 active totaling 82.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 13.6 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.