Pondtown Solar 2

PJM queue ID AB2-032

Pondtown Solar 2 (AB2-032) is listed in the PJM interconnection queue as a 13.6 MW solar project in Queen Anne's County, MD. The filing names Church-Wye Mills as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2023.

Queue IDAB2-032
Project namePondtown Solar 2
Status (as published)In Service
SubstationChurch-Wye Mills
Point of interconnectionChurch-Wye Mills 138 kV
CountyQueen Anne's
StateMD
Voltage138 kV
Capacity13.6 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-12-31
Source datasetserial

Same substation and county

Church-Wye Mills substation: 2 requests in the PJM queue, 2 active totaling 21.2 MW.

Queue IDProjectMWResourceStatus
AB2-153Pondtown Solar 27.6SolarIn Service

Queen Anne's, MD: 45 requests in the PJM queue, 8 active totaling 82.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity13.6
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.