Substation Scout

Cedarville substation interconnection queue

1 active project totaling 200 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Cedarville as the point of interconnection, all in OH.

Target commercial operation dates as filed run from Oct 2025 to Dec 2031 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: DEOK (1 filing).

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI1-167 Cedarville 138 kV 138 250 Battery Withdrawn Dec 2028
C01-2181 Cedarville 138 kV 138 200 Battery Active Dec 2031
AH2-029 Cedarville 12 kV 12 10.8 Solar Withdrawn Oct 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Clermont County, OH

All 23 PJM queue filings in Clermont County, OH.

Other PJM queue substations in Greene County, OH

All 8 PJM queue filings in Greene County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first