Cedarville substation interconnection queue

1 active project totalling 200 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
AI1-167 Cedarville 138 kV 138 250 Battery Withdrawn
C01-2181 Cedarville 138 kV 138 200 Battery Active
AH2-029 Cedarville 12 kV 12 10.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.