Cedarville-Ford substation interconnection queue
1 active project totalling 31.3 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
31.3active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-329 | Cedarville-Ford 138 kV | 138 | 208.8 | Battery | Withdrawn |
| AF1-315 | Cedarville-Ford 138 kV | 138 | 36 | Solar | Withdrawn |
| AF1-045 | Clermont County Solar Project | 138 | 31.3 | Battery | Suspended |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.