Cedarville-Ford substation interconnection queue
1 active project totaling 31.3 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Cedarville-Ford as the point of interconnection, all in Clermont County, OH.
Target commercial operation dates as filed run from Dec 2022 to Dec 2025 (3 filings).
1active projects
31.3active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-329 | Cedarville-Ford 138 kV | 138 | 208.8 | Battery | Withdrawn | Dec 2022 |
| AF1-315 | Cedarville-Ford 138 kV | 138 | 36 | Solar | Withdrawn | Dec 2023 |
| AF1-045 | Clermont County Solar Project | 138 | 31.3 | Battery | Suspended | Dec 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Clermont County, OH
- Zimmer: 1 active, 692.3 MW of 2 filed
- Cedarville: 1 active, 200 MW of 3 filed
- Ford-Cedarville: 1 active, 67.2 MW of 2 filed
- Eastwood: none active of 3 filed
- W.H. Zimmer Station: none active of 2 filed
Site Scanner