Cedarville-Ford substation interconnection queue

1 active project totaling 31.3 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Cedarville-Ford as the point of interconnection, all in Clermont County, OH.

Target commercial operation dates as filed run from Dec 2022 to Dec 2025 (3 filings).

1active projects
31.3active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-329 Cedarville-Ford 138 kV 138 208.8 Battery Withdrawn Dec 2022
AF1-315 Cedarville-Ford 138 kV 138 36 Solar Withdrawn Dec 2023
AF1-045 Clermont County Solar Project 138 31.3 Battery Suspended Dec 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Clermont County, OH

All 23 PJM queue filings in Clermont County, OH.