Substation Scout

Cedarville-Ford substation interconnection queue

1 active project totalling 31.3 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
31.3active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-329 Cedarville-Ford 138 kV 138 208.8 Battery Withdrawn
AF1-315 Cedarville-Ford 138 kV 138 36 Solar Withdrawn
AF1-045 Clermont County Solar Project 138 31.3 Battery Suspended

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.