Glady Run–Xenia substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Glady Run–Xenia as the point of interconnection, all in Greene County, OH.
Target commercial operation dates as filed run from Mar 2023 to Jun 2025 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-231 | Glady Run–Xenia 69 kV | 69 | 12 | Solar | Withdrawn | Mar 2023 |
| AH1-099 | Glady Run–Xenia 69 kV | 69 | 0 | Solar | Withdrawn | Jun 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Greene County, OH
- Cedarville: 1 active, 200 MW of 3 filed
- Greene-Clark: none active of 2 filed