0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AC2-085 Eastwood 34kV 34 10.8 Solar Withdrawn
AC2-086 Eastwood 34.5kV 34.5 10.8 Solar Withdrawn
AC2-095 Eastwood 138kV 138 5.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.