Eastwood substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AC2-085 | Eastwood 34kV | 34 | 10.8 | Solar | Withdrawn |
| AC2-086 | Eastwood 34.5kV | 34.5 | 10.8 | Solar | Withdrawn |
| AC2-095 | Eastwood 138kV | 138 | 5.4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.