Clermont, OH interconnection queue

8 active projects totalling 1,194.6 MW in the PJM queue, plus 15 with terminal status (shown greyed).

8active projects
1,194.6active MW
23total filed
Queue IDProjectkVMWResourceStatus
AJ1-008 Zimmer 345 kV 345 692.3 Hybrid Withdrawn
C01-2185 Zimmer 345 kV 345 692.3 Gas Active
AI1-167 Cedarville 138 kV 138 250 Battery Withdrawn
AE2-329 Cedarville-Ford 138 kV 138 208.8 Battery Withdrawn
C01-2181 Cedarville 138 kV 138 200 Battery Active
Y3-064 Pierce-Beckjord 138kV 138 160 Not reported In Service
AE2-318 Clermont County Solar Project 138 67.2 Solar Suspended
AG2-118 Ford-Cedarville 138 kV 138 56.2 Solar Withdrawn
AB2-156 W.H. Zimmer 345kV 345 50 Coal Withdrawn
Y3-073 W.H. Zimmer Station n/r 50 Coal Withdrawn
AH1-614 Burns 69 kV 69 40 Hybrid Withdrawn
AC2-088 Nestlewood Solar 69 38.4 Solar In Service
AF1-315 Cedarville-Ford 138 kV 138 36 Solar Withdrawn
AF1-045 Clermont County Solar Project 138 31.3 Battery Suspended
AC1-182 Zimmer Station 345 20 Coal Deactivated
AI2-348 Ford - Ceddarville 138 kV 138 17.4 Solar Withdrawn
AC2-085 Eastwood 34kV 34 10.8 Solar Withdrawn
AC2-086 Eastwood 34.5kV 34.5 10.8 Solar Withdrawn
AC2-095 Eastwood 138kV 138 5.4 Solar Withdrawn
AD1-136 Nestlewood Solar 69 5.4 Solar In Service
AB2-178 138kV Bus 5 Beckjord Battery 138 0 Battery Withdrawn
Y3-099 Beckjord Battery #1 n/r 0 Battery In Service
Y3-100 Beckjord Battery #2 n/r 0 Battery Deactivated

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.