Clermont, OH interconnection queue
8 active projects totalling 1,194.6 MW in the PJM queue, plus 15 with terminal status (shown greyed).
8active projects
1,194.6active MW
23total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AJ1-008 | Zimmer 345 kV | 345 | 692.3 | Hybrid | Withdrawn |
| C01-2185 | Zimmer 345 kV | 345 | 692.3 | Gas | Active |
| AI1-167 | Cedarville 138 kV | 138 | 250 | Battery | Withdrawn |
| AE2-329 | Cedarville-Ford 138 kV | 138 | 208.8 | Battery | Withdrawn |
| C01-2181 | Cedarville 138 kV | 138 | 200 | Battery | Active |
| Y3-064 | Pierce-Beckjord 138kV | 138 | 160 | Not reported | In Service |
| AE2-318 | Clermont County Solar Project | 138 | 67.2 | Solar | Suspended |
| AG2-118 | Ford-Cedarville 138 kV | 138 | 56.2 | Solar | Withdrawn |
| AB2-156 | W.H. Zimmer 345kV | 345 | 50 | Coal | Withdrawn |
| Y3-073 | W.H. Zimmer Station | n/r | 50 | Coal | Withdrawn |
| AH1-614 | Burns 69 kV | 69 | 40 | Hybrid | Withdrawn |
| AC2-088 | Nestlewood Solar | 69 | 38.4 | Solar | In Service |
| AF1-315 | Cedarville-Ford 138 kV | 138 | 36 | Solar | Withdrawn |
| AF1-045 | Clermont County Solar Project | 138 | 31.3 | Battery | Suspended |
| AC1-182 | Zimmer Station | 345 | 20 | Coal | Deactivated |
| AI2-348 | Ford - Ceddarville 138 kV | 138 | 17.4 | Solar | Withdrawn |
| AC2-085 | Eastwood 34kV | 34 | 10.8 | Solar | Withdrawn |
| AC2-086 | Eastwood 34.5kV | 34.5 | 10.8 | Solar | Withdrawn |
| AC2-095 | Eastwood 138kV | 138 | 5.4 | Solar | Withdrawn |
| AD1-136 | Nestlewood Solar | 69 | 5.4 | Solar | In Service |
| AB2-178 | 138kV Bus 5 Beckjord Battery | 138 | 0 | Battery | Withdrawn |
| Y3-099 | Beckjord Battery #1 | n/r | 0 | Battery | In Service |
| Y3-100 | Beckjord Battery #2 | n/r | 0 | Battery | Deactivated |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.