Ford-Cedarville substation interconnection queue

1 active project totaling 67.2 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Ford-Cedarville as the point of interconnection, all in Clermont County, OH.

Target commercial operation dates as filed run from Dec 2024 to Dec 2025 (2 filings).

1active projects
67.2active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-318 Clermont County Solar Project 138 67.2 Solar Suspended Dec 2025
AG2-118 Ford-Cedarville 138 kV 138 56.2 Solar Withdrawn Dec 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Clermont County, OH

All 23 PJM queue filings in Clermont County, OH.