Ford-Cedarville substation interconnection queue

1 active project totalling 67.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
67.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE2-318 Clermont County Solar Project 138 67.2 Solar Suspended
AG2-118 Ford-Cedarville 138 kV 138 56.2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.