Substation Scout

W.H. Zimmer Station substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
Y3-073 W.H. Zimmer Station n/r 50 Coal Withdrawn
AC1-182 Zimmer Station 345 20 Coal Deactivated

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.