Zimmer substation interconnection queue
1 active project totalling 692.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
692.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AJ1-008 | Zimmer 345 kV | 345 | 692.3 | Hybrid | Withdrawn |
| C01-2185 | Zimmer 345 kV | 345 | 692.3 | Gas | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.