Sumac Solar
PJM queue ID AD1-022
Sumac Solar (AD1-022) is listed in the PJM interconnection queue as a 51.8 MW solar project in Bertie County, NC. The filing names Cashie-Trowbridge as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of July 1, 2028.
| Queue ID | AD1-022 |
|---|---|
| Project name | Sumac Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Cashie-Trowbridge |
| Point of interconnection | Cashie-Trowbridge 230 kV |
| County | Bertie |
| State | NC |
| Voltage | 230 kV |
| Capacity | 51.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-07-01 |
| Source dataset | serial |
Same substation and county
Cashie-Trowbridge substation: 3 requests in the PJM queue, 1 active totaling 51.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AA2-157 | Cashie-Trowbridge 230kV | 56 | Solar | Withdrawn |
| AD1-023 | Cashie-Trowbridge 230 kV | 25.9 | Solar | Withdrawn |
Bertie, NC: 30 requests in the PJM queue, 9 active totaling 591.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 80 |
| MW capacity | 51.8 |
| MFO | 80 |