Martin, NC interconnection queue

3 active projects totalling 120.5 MW in the PJM queue, plus 6 with terminal status (shown greyed).

3active projects
120.5active MW
9total filed
Queue IDProjectkVMWResourceStatus
C01-1371 Chinquapin - Everetts 230 kV 230 60 Solar Active
AA2-157 Cashie-Trowbridge 230kV 230 56 Solar Withdrawn
P43 Domtar Paper Company Generating Units 7-10 115 50 Other In Service
AG2-120 Everetts 34.5 kV 34.5 14 Solar Withdrawn
AG1-551 Parnell Solar 34.5 13.1 Solar Withdrawn
AA1-067 Williamston Speight Solar 34.5 10.5 Solar In Service
AH2-384 Everetts 34.5kV 34.5 7 Hybrid Withdrawn
AA2-029 Everetts 34.5kV 34.5 5.6 Solar Withdrawn
AB2-098 Everetts 34.5kV 34.5 3.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.