Martin, NC interconnection queue
3 active projects totalling 120.5 MW in the PJM queue, plus 6 with terminal status (shown greyed).
3active projects
120.5active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1371 | Chinquapin - Everetts 230 kV | 230 | 60 | Solar | Active |
| AA2-157 | Cashie-Trowbridge 230kV | 230 | 56 | Solar | Withdrawn |
| P43 | Domtar Paper Company Generating Units 7-10 | 115 | 50 | Other | In Service |
| AG2-120 | Everetts 34.5 kV | 34.5 | 14 | Solar | Withdrawn |
| AG1-551 | Parnell Solar | 34.5 | 13.1 | Solar | Withdrawn |
| AA1-067 | Williamston Speight Solar | 34.5 | 10.5 | Solar | In Service |
| AH2-384 | Everetts 34.5kV | 34.5 | 7 | Hybrid | Withdrawn |
| AA2-029 | Everetts 34.5kV | 34.5 | 5.6 | Solar | Withdrawn |
| AB2-098 | Everetts 34.5kV | 34.5 | 3.5 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.