Everetts substation interconnection queue
1 active project totalling 10.5 MW in the PJM queue, plus 4 with terminal status (shown greyed).
1active projects
10.5active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-120 | Everetts 34.5 kV | 34.5 | 14 | Solar | Withdrawn |
| AA1-067 | Williamston Speight Solar | 34.5 | 10.5 | Solar | In Service |
| AH2-384 | Everetts 34.5kV | 34.5 | 7 | Hybrid | Withdrawn |
| AA2-029 | Everetts 34.5kV | 34.5 | 5.6 | Solar | Withdrawn |
| AB2-098 | Everetts 34.5kV | 34.5 | 3.5 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.