Everetts substation interconnection queue

1 active project totalling 10.5 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
10.5active MW
5total filed
Queue IDProjectkVMWResourceStatus
AG2-120 Everetts 34.5 kV 34.5 14 Solar Withdrawn
AA1-067 Williamston Speight Solar 34.5 10.5 Solar In Service
AH2-384 Everetts 34.5kV 34.5 7 Hybrid Withdrawn
AA2-029 Everetts 34.5kV 34.5 5.6 Solar Withdrawn
AB2-098 Everetts 34.5kV 34.5 3.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.