Morrow, OH interconnection queue

8 active projects totalling 956.9 MW in the PJM queue, plus 12 with terminal status (shown greyed).

8active projects
956.9active MW
20total filed
Queue IDProjectkVMWResourceStatus
C01-1805 Galion 345 kV 345 332.5 Battery Active
C01-1377 Galion 345 kV 345 300 Battery Active
AH1-765 Not reported n/r 205 Battery Withdrawn
C01-1074 Cardington 138 kV 138 200 Battery Active
AH2-217 Cardington 138 kV II 138 100 Battery Withdrawn
AH2-218 London 138 kV II 138 100 Battery Withdrawn
AI2-084 Galion 138 kV VI 138 78 Solar Withdrawn
AH1-282 Galion - Ohio Central 345 kV 345 45.9 Solar Active
V2-023 Galion-Muskingham River 345kV 345 37.5 Wind Withdrawn
AF2-150 Blossom Solar 138 37 Solar Under Construction
AI2-082 Cardington-Liberty 69 kV IV 69 34.7 Solar Withdrawn
AF1-122 Morrow County Solar II 69 26.9 Solar Pending Termination
V2-022 Galion-Leesburg 138kV 138 26.1 Wind Withdrawn
V2-042A_AT2 Galion 138kV 138 26 Wind Withdrawn
AH1-058 Galion 138 kV IV 138 24 Solar Withdrawn
AH2-009 Galion 138 kV V 138 24 Solar Withdrawn
AG1-039 Blossom Solar 138 23.5 Solar Under Construction
AH1-060 Crossroads Solar I 69 12 Solar Active
AG2-002 Galion 138 kV III 138 8.4 Solar Withdrawn
AG2-057 Cardington-Liberty 69 kV II 69 6 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.