Cardington 138 kV
PJM queue ID C01-1074
Cardington 138 kV (C01-1074) is listed in the PJM interconnection queue as a 200 MW battery project in Morrow County, OH. The filing names Cardington as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.
| Queue ID | C01-1074 |
|---|---|
| Project name | Cardington 138 kV |
| Status (as published) | Active |
| Substation | Cardington |
| Point of interconnection | Cardington 138 kV |
| County | Morrow |
| State | OH |
| Voltage | 138 kV |
| Capacity | 200 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-12-31 |
| Source dataset | cycle |
Same substation and county
Cardington substation: 2 requests in the PJM queue, 1 active totaling 200 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH2-212 | Cardington 138 kV | 69 | Solar | Withdrawn |
Morrow, OH: 20 requests in the PJM queue, 6 active totaling 938.9 MW.
A substation with the same name is named in PJM transmission planning materials: Cardington (ATSI, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Cardington Energy Storage, LLC |
|---|---|
| Transmission owner | ATSI |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 200.0 |
| MW capacity | 200.0 |
| MFO | 200.0 |
| Submitted date | 4/27/2026 |
| Last updated | 10/5/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.