Cambria Slope 115 kV
PJM queue ID C01-1175
Cambria Slope 115 kV (C01-1175) is listed in the PJM interconnection queue as a 200 MW battery project in Cambria County, PA. The filing names Cambria Slope as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.
| Queue ID | C01-1175 |
|---|---|
| Project name | Cambria Slope 115 kV |
| Status (as published) | Active |
| Substation | Cambria Slope |
| Point of interconnection | Cambria Slope 115 kV |
| County | Cambria |
| State | PA |
| Voltage | 115 kV |
| Capacity | 200 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-12-31 |
| Source dataset | cycle |
Same substation and county
Cambria Slope substation: 6 requests in the PJM queue, 1 active totaling 200 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD1-127 | Cambria Slope 115 kV | 235 | Gas | Withdrawn |
| M22 | Cambria Slope 115kV | 125 | Coal | Withdrawn |
| AJ1-016 | Cambria Slope 115 kV | 100 | Battery | Withdrawn |
| N28 | Cambria Slope 115kV | 40 | Coal | Withdrawn |
| AE1-165 | Cambria Slope 115kV | 12 | Solar | Withdrawn |
Cambria, PA: 46 requests in the PJM queue, 13 active totaling 1,643.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Idemitsu Renewables America Development LLC |
|---|---|
| Transmission owner | PENELEC |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 200.0 |
| MW capacity | 200.0 |
| MFO | 200.0 |
| Submitted date | 4/25/2026 |
| Last updated | 5/29/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.