Substation Scout

Cambria Slope 115 kV

PJM queue ID C01-1175

Cambria Slope 115 kV (C01-1175) is listed in the PJM interconnection queue as a 200 MW battery project in Cambria County, PA. The filing names Cambria Slope as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.

Queue IDC01-1175
Project nameCambria Slope 115 kV
Status (as published)Active
SubstationCambria Slope
Point of interconnectionCambria Slope 115 kV
CountyCambria
StatePA
Voltage115 kV
Capacity200 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-12-31
Source datasetcycle

Same substation and county

Cambria Slope substation: 6 requests in the PJM queue, 1 active totaling 200 MW.

Queue IDProjectMWResourceStatus
AD1-127Cambria Slope 115 kV235GasWithdrawn
M22Cambria Slope 115kV125CoalWithdrawn
AJ1-016Cambria Slope 115 kV100BatteryWithdrawn
N28Cambria Slope 115kV40CoalWithdrawn
AE1-165Cambria Slope 115kV12SolarWithdrawn

Cambria, PA: 46 requests in the PJM queue, 13 active totaling 1,643.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperIdemitsu Renewables America Development LLC
Transmission ownerPENELEC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy200.0
MW capacity200.0
MFO200.0
Submitted date4/25/2026
Last updated5/29/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first