Bristers 500 kV
PJM queue ID C01-1884
Bristers 500 kV (C01-1884) is listed in the PJM interconnection queue as a 1,000 MW battery project in Fauquier County, VA. The filing names Bristers as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 31, 2030.
| Queue ID | C01-1884 |
|---|---|
| Project name | Bristers 500 kV |
| Status (as published) | Active |
| Substation | Bristers |
| Point of interconnection | Bristers 500 kV |
| County | Fauquier |
| State | VA |
| Voltage | 500 kV |
| Capacity | 1,000 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-10-31 |
| Source dataset | cycle |
Same substation and county
Bristers substation: 3 requests in the PJM queue, 1 active totaling 1,000 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI1-032 | Bristers 115kV | 200 | Battery | Withdrawn |
| AG2-305 | Bristers 230 kV | 100 | Battery | Withdrawn |
Fauquier, VA: 52 requests in the PJM queue, 18 active totaling 2,367 MW.
A substation with the same name is named in PJM transmission planning materials: Bristers (DOM, 11 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Cedar Holdco LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 1000.0 |
| MW capacity | 1000.0 |
| MFO | 1000.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/10/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.