Waverly Solar

PJM queue ID AB2-161

Waverly Solar (AB2-161) is listed in the PJM interconnection queue as a 19 MW solar project in Sussex County, VA. The filing names Waverly #2 DP as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 29, 2023.

Queue IDAB2-161
Project nameWaverly Solar
Status (as published)In Service
SubstationWaverly #2 DP
Point of interconnectionWaverly #2 DP 115kV
CountySussex
StateVA
Voltage115 kV
Capacity19 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-12-29
Source datasetserial

Same substation and county

Sussex, VA: 39 requests in the PJM queue, 14 active totaling 1,580.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy50
MW capacity19
MFO50

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first