Wantage Solar Farm

PJM queue ID W3-110

Wantage Solar Farm (W3-110) is listed in the PJM interconnection queue as a 2.9 MW solar project in Sussex County, NJ. The filing names Sussex as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2014.

Queue IDW3-110
Project nameWantage Solar Farm
Status (as published)In Service
SubstationSussex
Point of interconnectionSussex
CountySussex
StateNJ
VoltageNot reported
Capacity2.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2014-12-31
Source datasetserial

Same substation and county

Sussex substation: 11 requests in the PJM queue, 2 active totaling 6.6 MW.

Queue IDProjectMWResourceStatus
Y1-020Beaver Run Solar Farm3.7SolarIn Service
X1-106Sussex6.4SolarWithdrawn
V3-011Sussex County Land Fill3.4GasDeactivated
X3-085Sussex 34kV3SolarWithdrawn
C01-2248Sussex 12.47 kV2.9SolarWithdrawn
W4-066Sussex1.9SolarWithdrawn
X3-054Hough Solar Farm1.9SolarWithdrawn
X1-075Sussex 12kV1.5SolarWithdrawn
W4-065Layton Road Solar Farm1.1SolarWithdrawn
AA2-117Sussex0BatteryWithdrawn

Sussex, NJ: 68 requests in the PJM queue, 12 active totaling 14 MW.

A substation with the same name is named in PJM transmission planning materials: Sussex (JCPL, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy7.5
MW capacity2.85
MFO7.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first