Substation Scout

Beaver Run Solar Farm

PJM queue ID W3-106

Beaver Run Solar Farm (W3-106) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Sussex County, NJ. The filing names Sussex-Wykertown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 30, 2015.

Queue IDW3-106
Project nameBeaver Run Solar Farm
Status (as published)In Service
SubstationSussex-Wykertown
Point of interconnectionSussex-Wykertown 34.5kV
CountySussex
StateNJ
Voltage34.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2015-09-30
Source datasetserial

Same substation and county

Sussex, NJ: 68 requests in the PJM queue, 12 active totaling 14 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy9.9
MW capacity0
MFO9.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.