Substation Scout

Viridity Energy Solutions Montague Storage

PJM queue ID AF1-019

Viridity Energy Solutions Montague Storage (AF1-019) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Sussex County, NJ. The filing names Branchville-Holiday Lakes as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 31, 2025.

Queue IDAF1-019
Project nameViridity Energy Solutions Montague Storage
Status (as published)In Service
SubstationBranchville-Holiday Lakes
Point of interconnectionBranchville-Holiday Lakes 34.5 kV
CountySussex
StateNJ
Voltage34.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2025-01-31
Source datasetserial

Same substation and county

Branchville-Holiday Lakes substation: 4 requests in the PJM queue, 1 active totaling 0 MW.

Queue IDProjectMWResourceStatus
W3-126Syncarpha Ty Solar Farm6.4SolarWithdrawn
X1-105Branchville-Holiday Lakes 34.5kV4.3SolarWithdrawn
W2-084Roberts Solar Farm3.8SolarWithdrawn

Sussex, NJ: 68 requests in the PJM queue, 12 active totaling 14 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity0
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first