Durban Ave Solar (AE1-081) is listed in the PJM interconnection queue as a 0.5 MW solar project in Sussex County, NJ. The filing names Landing as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2021.

Queue IDAE1-081
Project nameDurban Ave Solar
Status (as published)In Service
SubstationLanding
Point of interconnectionLanding 12.47 kV
CountySussex
StateNJ
Voltage12.5 kV
Capacity0.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2021-06-30
Source datasetserial

Same substation and county

Sussex, NJ: 68 requests in the PJM queue, 12 active totaling 14 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy1.25
MW capacity0.52
MFO1.25

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first