Frankford Solar Farm
PJM queue ID X1-012
Frankford Solar Farm (X1-012) is listed in the PJM interconnection queue as a 3.8 MW solar project in Sussex County, NJ. The filing names Branchville-Sussex as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2016.
| Queue ID | X1-012 |
|---|---|
| Project name | Frankford Solar Farm |
| Status (as published) | In Service |
| Substation | Branchville-Sussex |
| Point of interconnection | Branchville-Sussex 34.5kV |
| County | Sussex |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 3.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2016-06-01 |
| Source dataset | serial |
Same substation and county
Branchville-Sussex substation: 4 requests in the PJM queue, 1 active totaling 3.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| X4-012 | Plains Road Solar Farm | 2.3 | Solar | Withdrawn |
| X1-103 | Branchville-Sussex 34.5kV | 1.5 | Solar | Withdrawn |
| Z2-095 | Branchville-Sussex 34kV | 0 | Battery | Withdrawn |
Sussex, NJ: 68 requests in the PJM queue, 12 active totaling 14 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 10 |
| MW capacity | 3.8 |
| MFO | 10 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.