Substation Scout

Roy Road Battery Storage Facility

PJM queue ID AA2-060

Roy Road Battery Storage Facility (AA2-060) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Sussex County, NJ. The filing names Branchville-Sussex #1 as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 31, 2023.

Queue IDAA2-060
Project nameRoy Road Battery Storage Facility
Status (as published)In Service
SubstationBranchville-Sussex #1
Point of interconnectionBranchville-Sussex #1 34kV
CountySussex
StateNJ
Voltage34 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2023-07-31
Source datasetserial

Same substation and county

Sussex, NJ: 68 requests in the PJM queue, 12 active totaling 14 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy6
MW capacity0
MFO6

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first