Houses Corner Storage
PJM queue ID AF1-325
Houses Corner Storage (AF1-325) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Sussex County, NJ. The filing names Sparta-Woodruff's Gap as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 1, 2026.
| Queue ID | AF1-325 |
|---|---|
| Project name | Houses Corner Storage |
| Status (as published) | Engineering and Procurement |
| Substation | Sparta-Woodruff's Gap |
| Point of interconnection | Sparta-Woodruff's Gap 34.5 kV |
| County | Sussex |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-12-01 |
| Source dataset | serial |
Same substation and county
Sparta-Woodruff's Gap substation: 2 requests in the PJM queue, 1 active totaling 0 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| X2-099 | Sparta Solar Farm | 3.8 | Solar | Withdrawn |
Sussex, NJ: 68 requests in the PJM queue, 12 active totaling 14 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 0 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.