Woodruffs Gap, Bank 2 12.47 kV
PJM queue ID C01-1039
Woodruffs Gap, Bank 2 12.47 kV (C01-1039) is listed in the PJM interconnection queue as a 2 MW solar project in Sussex County, NJ. The filing names Woodruffs Gap, Bank 2 as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2026.
| Queue ID | C01-1039 |
|---|---|
| Project name | Woodruffs Gap, Bank 2 12.47 kV |
| Status (as published) | Active |
| Substation | Woodruffs Gap, Bank 2 |
| Point of interconnection | Woodruffs Gap, Bank 2 12.47 kV |
| County | Sussex |
| State | NJ |
| Voltage | 12.5 kV |
| Capacity | 2 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-06-01 |
| Source dataset | cycle |
Same substation and county
Sussex, NJ: 68 requests in the PJM queue, 12 active totaling 14 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Hamms Landfill Solar Farm LLC |
|---|---|
| Transmission owner | JCPL |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 4.8 |
| MW capacity | 2.0 |
| MFO | 4.8 |
| Submitted date | 10/23/2025 |
| Last updated | 6/18/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.