Waterh_POI_5 substation interconnection queue

5 active projects totaling 757.2 MW in the ERCOT queue.

5 ERCOT queue filings name Waterh_POI_5 as the point of interconnection, all in Wharton County, TX.

Target commercial operation dates as filed run from Dec 2026 to Aug 2027 (5 filings). 5 active filings target a date after November 27, 2026.

Interconnecting entity as filed: GulfStar Power, LLC (5 filings).

5active projects
757.2active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
26INR0725 PHOTON BESS REPOWERING 345 305.5 Battery SS Completed, FIS Completed, No IA Aug 2027
25INR0493 PHOTON SOLAR 1 2 SLF 345 235.7 Solar SS Completed, FIS Completed, IA Dec 2026
23INR0111 PHOTON SOLAR 3 SLF 345 110 Solar SS Completed, FIS Completed, IA Dec 2026
25INR0673 PHOTON SOLAR 4 SLF 345 106 Solar SS Completed, FIS Completed, No IA Dec 2026
26INR0718 PHOTON SOLAR REPOWERING 345 0 Solar SS Completed, FIS Completed, IA Aug 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-0526INR0725Status changen/a SS Completed, FIS Started, No IA → SS Completed, FIS Completed, No IA
2026-10-0526INR0718Status changen/a SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA

Other ERCOT queue substations in Wharton County, TX

All 44 ERCOT queue filings in Wharton County, TX.