tap Blue – Hillje Ckt.#27 substation interconnection queue

3 active projects totalling 660.6 MW in the ERCOT queue.

3active projects
660.6active MW
3total filed
Queue IDProjectkVMWResourceStatus
21INR0220 Maleza Solar 345 254.9 Solar SS Completed, FIS Not Started, IA
23INR0227 Maleza Solar II 345 254.9 Solar SS Completed, FIS Started, No IA
21INR0456 Maleza Storage 345 150.8 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.