PHOTON SOLAR 3 SLF

ERCOT queue ID 23INR0111

PHOTON SOLAR 3 SLF (23INR0111) is listed in the ERCOT interconnection queue as a 110 MW solar project in Wharton County, TX. The filing names Waterh_POI_5 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 15, 2026. It records the screening study as complete on February 2, 2021, the full interconnection study as approved on November 28, 2022 and the interconnection agreement as signed on October 1, 2021.

Queue ID23INR0111
Project namePHOTON SOLAR 3 SLF
Status (as published)SS Completed, FIS Completed, IA
SubstationWaterh_POI_5
Point of interconnection44880 Waterh_POI_5 345kV
CountyWharton
StateTX
Voltage345 kV
Capacity110 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2026-12-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Waterh_POI_5 substation: 5 requests in the ERCOT queue, 5 active totaling 757.2 MW.

Queue IDProjectMWResourceStatus
26INR0725PHOTON BESS REPOWERING305.5BatterySS Completed, FIS Completed, No IA
25INR0493PHOTON SOLAR 1 2 SLF235.7SolarSS Completed, FIS Completed, IA
25INR0673PHOTON SOLAR 4 SLF106SolarSS Completed, FIS Completed, No IA
26INR0718PHOTON SOLAR REPOWERING0SolarSS Completed, FIS Completed, IA

Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGulfStar Power, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2021-10-01
Screening study complete2021-02-02
Full interconnection study approved2022-11-28
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first