tap of Chalmers - Lane City substation interconnection queue
2 active projects totaling 267.1 MW in the ERCOT queue.
2 ERCOT queue filings name tap of Chalmers - Lane City as the point of interconnection, all in Wharton County, TX.
Target commercial operation date as filed: Apr 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: CH Neal Solar LLC (1 filing), CH Neal Battery LLC (1 filing).
2active projects
267.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 28INR0160 | Neal Solar | 138 | 146.6 | Solar | SS Completed, FIS Started, No IA | Apr 2029 |
| 28INR0452 | Neal Battery | 138 | 120.5 | Battery | SS Completed, FIS Started, No IA | Apr 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Wharton County, TX
- Hillje: 4 active, 1,518.9 MW of 4 filed
- Waterh_POI_5: 5 active, 757.2 MW of 5 filed
- Bailey: 3 active, 707.8 MW of 3 filed
- tap Blue – Hillje Ckt.#27: 3 active, 660.6 MW of 3 filed
- Gulftie: 2 active, 416.1 MW of 2 filed
Site Scanner