PHOTON SOLAR 1 2 SLF
ERCOT queue ID 25INR0493
PHOTON SOLAR 1 2 SLF (25INR0493) is listed in the ERCOT interconnection queue as a 235.7 MW solar project in Wharton County, TX. The filing names Waterh_POI_5 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 15, 2026. It records the screening study as complete on February 2, 2021, the full interconnection study as approved on November 28, 2022 and the interconnection agreement as signed on October 1, 2021.
| Queue ID | 25INR0493 |
|---|---|
| Project name | PHOTON SOLAR 1 2 SLF |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Waterh_POI_5 |
| Point of interconnection | 44880 Waterh_POI_5 345kV |
| County | Wharton |
| State | TX |
| Voltage | 345 kV |
| Capacity | 235.7 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-12-15 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Waterh_POI_5 substation: 5 requests in the ERCOT queue, 5 active totaling 757.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 26INR0725 | PHOTON BESS REPOWERING | 305.5 | Battery | SS Completed, FIS Completed, No IA |
| 23INR0111 | PHOTON SOLAR 3 SLF | 110 | Solar | SS Completed, FIS Completed, IA |
| 25INR0673 | PHOTON SOLAR 4 SLF | 106 | Solar | SS Completed, FIS Completed, No IA |
| 26INR0718 | PHOTON SOLAR REPOWERING | 0 | Solar | SS Completed, FIS Completed, IA |
Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | GulfStar Power, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2021-10-01 |
| Screening study complete | 2021-02-02 |
| Full interconnection study approved | 2022-11-28 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.