Gulftie substation interconnection queue
2 active projects totaling 416.1 MW in the ERCOT queue.
2 ERCOT queue filings name Gulftie as the point of interconnection, all in Wharton County, TX.
Target commercial operation dates as filed run from Mar 2025 to Dec 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
Interconnecting entity as filed: Boling Generation (1 filing), Wharton County Generation, LLC (1 filing).
2active projects
416.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 24INR0576 | Boling Generation (TEF-Due Diligience) | 138 | 400 | Gas | SS Completed, FIS Completed, No IA | Dec 2028 |
| 24INR0605 | TEXAS GULF SULPHUR REPOWER | 138 | 16.1 | Gas | SS Completed, FIS Completed, IA | Mar 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Wharton County, TX
- Hillje: 4 active, 1,518.9 MW of 4 filed
- Waterh_POI_5: 5 active, 757.2 MW of 5 filed
- Bailey: 3 active, 707.8 MW of 3 filed
- tap Blue – Hillje Ckt.#27: 3 active, 660.6 MW of 3 filed
- tap of Chalmers - Lane City: 2 active, 267.1 MW of 2 filed