Bailey substation interconnection queue
3 active projects totaling 707.8 MW in the ERCOT queue.
3 ERCOT queue filings name Bailey as the point of interconnection, all in Wharton County, TX.
Target commercial operation dates as filed run from Dec 2026 to Dec 2029 (3 filings). 3 active filings target a date after November 27, 2026.
Interconnecting entity as filed: AEUG Peach Creek Solar LLC (1 filing), Erin Solar LLC (1 filing), RWE Clean Energy, LLC (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 29INR0082 | Peach Creek Solar | 345 | 300 | Solar | SS Completed, FIS Started, No IA | Sep 2029 |
| 23INR0058 | Erin Solar | 345 | 208.3 | Solar | SS Completed, FIS Completed, IA | Dec 2029 |
| 22INR0517 | Lane City Wind | 345 | 199.5 | Wind | SS Completed, FIS Completed, IA | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-11-09 | 23INR0058 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
Same name on other Substation Scout pages
Other sources that print a substation named “Bailey” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
Other ERCOT queue substations in Wharton County, TX
- Hillje: 4 active, 1,518.9 MW of 4 filed
- Waterh_POI_5: 5 active, 757.2 MW of 5 filed
- tap Blue – Hillje Ckt.#27: 3 active, 660.6 MW of 3 filed
- Gulftie: 2 active, 416.1 MW of 2 filed
- tap of Chalmers - Lane City: 2 active, 267.1 MW of 2 filed