Hillje substation interconnection queue

4 active projects totaling 1,518.9 MW in the ERCOT queue.

4 ERCOT queue filings name Hillje as the point of interconnection, all in Wharton County, TX.

Target commercial operation dates as filed run from Nov 2026 to Jun 2028 (4 filings). 4 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Danish Fields Solar, LLC (1 filing), Hecate Energy Ramsey Storage LLC (1 filing), Apollo Solar Ranch, LLC (1 filing), EDF Renewables Development, Inc. (1 filing).

4active projects
1,518.9active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
20INR0069 Danish Fields Solar 345 602.8 Solar SS Completed, FIS Completed, IA Nov 2026
21INR0505 Ramsey Storage 345 500 Battery SS Completed, FIS Started, IA Jun 2028
21INR0341 Space City Solar 345 366 Solar SS Completed, FIS Started, IA Jun 2027
20INR0238 Voyager Storage 345 50.1 Battery SS Completed, FIS Started, No IA Apr 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Hillje” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other ERCOT queue substations in Wharton County, TX

All 44 ERCOT queue filings in Wharton County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first