Hillje substation interconnection queue
4 active projects totaling 1,518.9 MW in the ERCOT queue.
4 ERCOT queue filings name Hillje as the point of interconnection, all in Wharton County, TX.
Target commercial operation dates as filed run from Nov 2026 to Jun 2028 (4 filings). 4 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Danish Fields Solar, LLC (1 filing), Hecate Energy Ramsey Storage LLC (1 filing), Apollo Solar Ranch, LLC (1 filing), EDF Renewables Development, Inc. (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 20INR0069 | Danish Fields Solar | 345 | 602.8 | Solar | SS Completed, FIS Completed, IA | Nov 2026 |
| 21INR0505 | Ramsey Storage | 345 | 500 | Battery | SS Completed, FIS Started, IA | Jun 2028 |
| 21INR0341 | Space City Solar | 345 | 366 | Solar | SS Completed, FIS Started, IA | Jun 2027 |
| 20INR0238 | Voyager Storage | 345 | 50.1 | Battery | SS Completed, FIS Started, No IA | Apr 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Hillje” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
Other ERCOT queue substations in Wharton County, TX
- Waterh_POI_5: 5 active, 757.2 MW of 5 filed
- Bailey: 3 active, 707.8 MW of 3 filed
- tap Blue – Hillje Ckt.#27: 3 active, 660.6 MW of 3 filed
- Gulftie: 2 active, 416.1 MW of 2 filed
- tap of Chalmers - Lane City: 2 active, 267.1 MW of 2 filed